Policy SS2A: New Development

Policy SS2A: New Development

  1. The Neighbourhood Plan allocates 25 Ha of land to the east of the village centre and 11 Ha of land south of Holt Road, as shown on the Policies Map, for a mixed-use development scheme comprising:
  1. A Sports Hub on land south of Holt Road for sport and recreation uses;
  2. A community hub building on land to the east of the village centre for a mixed-use venue which must include local community space; and
  3. A *facilitating residential scheme on land to the east of the village centre of approximately 300 dwellings comprising open market, affordable and serviced plots for self-build or custom build homes in accordance with Policy HBE1: Mixed Housing and the Greater Norwich Local Plan requirements. 

*The facilitating residential scheme is designed to enable the provision of a Sports Hub on land south of Holt Road for sport and recreation uses. A legal agreement will be required committing the developer to provide the minimum requirements towards the Sports Hub scheme, as set out in Clauses B and C below.

  1. Proposals must be made by the land promoter/developer either as a single comprehensive planning application for the facilitating residential scheme and the change of use of land for the Sports Hub, including its access and the supporting infrastructure in Clause C, or as two planning applications, one for each, determined together and tied by a Section 106 agreement. In either case, proposals must include:
  1.  An illustrative masterplan for both parcels of land developed and agreed with Horsford Parish Council that defines the land uses and key development principles for access, layout, design, and the principles of phasing and implementation taking into consideration the development principles listed and shown at Figure 2;
  2. A delivery plan setting out when the Sports Hub land will be transferred and when the supporting infrastructure for the Sports Hub scheme as set out in Clause C, will be delivered or the financial contribution paid, in relation to the phasing of the facilitating residential scheme;
  3. Any further drainage or ground conditions information for the Sports Hub land needed to update or supplement the technical evidence supporting this allocation;
  4. A planning obligation to secure:
  1. the transfer of the land for the Sports Hub and supporting infrastructure to Horsford Parish Council, or a nominated appropriate body, by way of either a freehold transfer or a lease for a term of not less than 100 years, together with governance arrangements, following planning consent and prior to the commencement of the facilitating residential scheme. Where a lease is proposed, details of its renewal, the ownership of buildings and infrastructure, and the future operation and management of the Sports Hub must be provided with the planning application;
  2. the Sports Hub supporting infrastructure required by Clause C, either through their delivery by the developer or through a financial contribution in accordance with that clause;
  3. the operation of the community hub as a mixed-use venue at an appropriate trigger point during the build of the facilitating residential scheme, including space available for hire by the local community at rates comparable to local community facilities; and
  4. other relevant community facilities and infrastructure and financial contributions at appropriate trigger points.
  1. The development shall provide, as a minimum, the following supporting infrastructure to enable the delivery of the Sports Hub by Horsford Parish Council, or a nominated appropriate body:
  1. vehicular access to the boundary of the Sports Hub land from Holt Road in a form to be agreed with the local highway authority;
  2. a shared footway/cycleway linking the Sports Hub site entrance to the existing active travel network at the Brewery Lane roundabout, including a safe crossing point on Holt Road south of the roundabout, in a form to be agreed with the local highway authority;
  3. utility connections to the boundary of the Sports Hub land comprising foul water drainage (including any off-site rising main and on-site pumping station required), a mains water supply, an electricity supply of sufficient capacity to serve the Sports Hub, and telecommunications; and
  4. structural landscaping comprising a planted buffer to the A1270 and boundary containment planting to the Sports Hub land.

This supporting infrastructure shall either be delivered by the developer or be secured through a financial contribution equivalent to its full cost, as assessed by an independent quantity surveyor and agreed with Horsford Parish Council. Any contribution shall be index-linked and made available to Horsford Parish Council, or a nominated appropriate body, to draw down as and when required to implement the scheme. Where the supporting infrastructure is to be secured through a financial contribution, it shall be paid prior to the commencement of the facilitating residential scheme. Where it is to be delivered by the developer, it shall be completed prior to the first occupation of any dwelling within the facilitating residential scheme.

  1. The Sports Hub scheme shall be confined to land south of Holt Road and the land shall be safeguarded for the provision of sport and recreation facilities and supporting infrastructure for the local community. 
  2. The community hub scheme shall be confined to land to the east of the village centre and comprise either the conversion of the existing barn, or the provision of a single multi-purpose building within the same location if the existing building cannot be converted as part of the enabling residential scheme. In either case the scheme shall be accompanied by appropriate levels of parking and noise attenuation measures to protect the amenity of nearby residential properties whilst allowing the facility to meet a wider range of community needs on weekdays and weekends. 
  3. The facilitating residential scheme shall be confined to the east of the village centre and shall comprise a mix of dwelling types required by Policy HBE1: Mixed Housing, designed to reflect local character as required by Policy HBE2: Horsford Design Code to sustain and enhance the setting and significance of heritage assets, to provide natural surveillance for the community hub scheme, and planned as an extension of the existing built development edge rather than detached, standalone development parcels. The layout will provide for appropriate offset distances and screening to protect the residential amenity of the existing dwellings. 
  4. The facilitating residential scheme application shall be accompanied by an active travel strategy that must include proposals compliant with Policies TRA1: Sustainable Travel and ENV1 Green Infrastructure Network including:
  1. the delivery of the eastern section of the Green Circular Path which must also operate as an active travel link between the two school sites; 
  2. securing safe and convenient walking and cycling to and between other community facilities and services identified in Policy COM1: Community Facilities and Local Services;
  3. providing access to the countryside through making connections with existing public right of ways and enabling access to be secured to the Diamond Jubilee Plantation woodland from the site; and 
  4. delivering the road safety measures of the Horsford Transport Masterplan including a safe crossing on Holt Road to the village centre.
  1. The facilitating residential scheme application shall be accompanied by a transport strategy that must comprise measures to satisfactorily manage the traffic effects of this development on the road network in accordance with the Horsford Transport Master Plan including facilitating gateways and crossings for traffic calming and public realm improvements along Holt Road. 
  2. The facilitating residential scheme application shall be accompanied by a green infrastructure strategy that must make provision for landscape, biodiversity, sustainable drainage, and public open space strategies that demonstrate how existing environmental assets and landscape character on the site will be protected and enhanced. This should include bolstering the green edges of the site, with appropriate planting, retaining or reinstating field boundaries, and locating open space provision as a setting for the community hub scheme. The facilitating residential scheme must also make provision for community gardens and allotments.
  1. The allocation of housing here is first and foremost to facilitate the delivery of a number of vital land uses and infrastructure to meet local needs. These include critical community facilities and active travel benefits which cannot otherwise be met. In addition, this provision will increase the contribution of the village to meet the additional local housing needs required for the Greater Norwich area under the Government’s new mandatory ‘standard method’ for the period to 2045. The land for the residential scheme is well located in respect of access to other village facilities and provides an opportunity to complete a Green Circular Path around the village and an active travel link between the two schools. The siting of the Sports Hub to the south of Holt Road, alongside improvements to active travel, ought to relieve some of the pressures faced on the busy Holt Road through the village. It is therefore vital that a masterplan demonstrates how the layout and design of each of the component schemes will fit into and enhance the operation and experience of existing village life. 
  2. The development principles diagram shown below is for illustrative purposes only at this stage. There may be different ways in which the scheme components and on-site mitigation measures can be planned, and this will be addressed at the planning application stage. In any event, the design of the overall layout and distinct schemes will be expected to follow adopted guidance and in combination with the Horsford Design Guidelines and Code, ensure that it stitches into the fabric of the village visually as well as functionally. 
Site SS2a: Development Principles Diagram
(A) Green infrastructure 
(B) Community facilities
(C) Access to woodland and recreation uses 
(D) Pedestrian/cycle route linking into the existing route to complete a new Green Ring around the village 
(E) & (F) Key elements of the Transport Masterplan
  1. The evidence base and site assessment note explain the rationale for selecting this land for allocation. The land presents a generational opportunity to address matters of increasing concern to the local community. The efforts of authorities forming part of Greater Norwich area, and local sport and recreational clubs and societies, to encourage active lifestyle behaviours and inspire people to become more active has been very successful and has resulted in a critical need for additional sport and recreation facilities. If left unaddressed, there is the potential to undermine that success in future years. A feasibility study undertaken by Broadland District Council in May 2023, published in the evidence base, demonstrates that there is a strong level of need for such proposals.
  2. Whilst the existing village hall remains an important asset well-used by the local community, with historic and the proposed growth of the village, there is a desire for additional community space to contribute to an enhanced village life offer. Both of these additional community facility spaces were supported by the majority of the local community at the most recent community consultation. Since the Regulation 14 consultation, the proposals for the community hub have evolved. Rather than dedicated space managed by the Parish Council, the intention is that the existing barns will be converted/part redeveloped to provide a mixed-use venue, retained by the landowner, which includes community space available for hire. The Parish Council has accepted this change given the long-term security and supporting infrastructure now secured for the Sports Hub. 
  3. The facilitating residential scheme serves several purposes. Firstly, it makes the land available from its private owner for the Sports Hub scheme and provides an opportunity for additional local community space for hire to become available. Despite extensive efforts no suitable public or other private land has been made available for these purposes. Secondly, it goes some way to assist in meeting the government’s new standard method for local housing need in Greater Norwich. Therefore, the Parish Council anticipates that, should the plan be made, the parish will benefit from the provisions of national decision-making policy S6 of the NPPF. Additionally, the scheme will deliver new active travel links and enable the implementation of traffic management measures to encourage active travel and connection to the open countryside as well as a range of green infrastructure improvements to biodiversity and local nature recovery.
  4. The developer is responsible for securing planning permission for the change of use of the Sports Hub land, its access and supporting infrastructure. Any subsequent application for buildings, pitches and supporting infrastructure such as car parking on the Sports Hub land will be brought forward by the Parish Council or nominated appropriate body. The policy requires that proposals, whether made as one comprehensive application or two applications tied by a Section 106 agreement, must cover all of its elements and must set out precisely how and when the community hub scheme will be delivered and the serviced land for the Sports Hub will be transferred. This reflects that the facilitating residential scheme must enable the timely delivery and transfer of land on terms that are acceptable, leaving no prospect that the residential element will be built out and occupied before the community hub scheme is secured and able to operate and the Sports Hub project can commence. This will be done through a planning obligation, which will also secure other elements of the policy, for example its affordable housing. The land promoter has confirmed its commitment to making the Sports Hub land available and to the delivery or funding of the supporting infrastructure set out in Clause C. The policy does not repeat the requirements of other parts of the ‘development plan’ which will continue to apply alongside the HNPR. If two applications are made, they must be submitted together and tied by a Section 106 agreement.
  5. The Sports Hub is one of the principal community benefits relied upon to justify the scale of the facilitating residential scheme, which is substantially above the level of growth that would ordinarily be expected in a Village Cluster settlement under the Greater Norwich Local Plan. That benefit must therefore be enduring. Broadland District Council has advised that a time-limited benefit cannot reasonably be relied upon to justify permanent housing development and that, ideally, the land should be transferred freehold or, as a minimum, by way of a lease of not less than 100 years. A freehold transfer is preferred by both the District and Parish Council and would be likely to carry significant weight in the planning balance. A long-term interest will also place the Parish Council, or nominated body, in the strongest position to compete for external grant funding and to justify the investment of time, money and resources needed to deliver, operate and maintain the facility. Where a lease is proposed, the planning application should be accompanied by heads of terms addressing lease renewal, the ownership of buildings and infrastructure, and the future operation of the facility.
  6. Clause C sets out the minimum package of supporting infrastructure works needed to enable the Sports Hub to be delivered: vehicular access, an active travel connection to the village, utilities to the site boundary and structural landscaping. These works have been identified in discussion with the land promoter and are supported by technical evidence, including a Transport Technical Note, indicative highway drawings and a Flood Risk and Drainage Technical Note (Paul Basham Associates, September 2026). None of them relies on, or would constrain, the eventual layout of the Sports Hub. The policy therefore allows flexibility in how they are secured: they may be built by the developer, or their full cost, as assessed by an independent quantity surveyor and agreed with the Parish Council, may be paid as a financial contribution for the Parish Council, or nominated body, to draw down as and when needed. This allows the works to be co-ordinated with the delivery of the Sports Hub itself. In either case, they will be secured through the planning obligation. Given that the facilitating residential scheme is only acceptable because of the Sports Hub it enables, the supporting infrastructure must be secured before the residential scheme commences (if a financial contribution is made) or completed before any dwelling is occupied (if delivered by the developer).
  7. The active travel link between the Sports Hub and the Brewery Lane roundabout, and the associated crossing of Holt Road, are essential to ensure that the Sports Hub can be reached safely on foot and by bicycle from the village and is not reliant on the private car. The indicative design prepared to date is based on the likely extent of highway land, pending confirmation of highway boundary information from Norfolk County Council as the local highway authority. The precise alignment, the form of crossing (which may need to be signal-controlled depending on vehicle speeds) and the access visibility splays will therefore be confirmed at the planning application stage in agreement with the local highway authority.
  8. The technical evidence confirms that the land south of Holt Road lies wholly within Flood Zone 1, is at very low risk of flooding from all sources, and is underlain by sand and gravel deposits suitable for the infiltration of surface water. It also confirms that ground levels and conditions are suitable for the formation of sports pitches. This evidence is considered sufficient to demonstrate that the land is suitable for the Sports Hub. The detailed surface water drainage strategy and any levelling works needed for the pitches can only be determined once the layout of the Sports Hub is known, and will therefore be designed and costed as part of the Sports Hub scheme itself. Any drainage strategy will need to take account of the location of the site within a groundwater Source Protection Zone. Further information may be required at the planning application stage, as provided for by Clause B(iii).